Fabricating

Rachke Piping and Mechanical, Inc.

Will County Station


Rachke Piping and Mechanical's Latest News



Pipe Burst Test:   Rachke Piping was contracted to perform a Burst Test on a section of pipe that was removed from service due to wall thickness anomalies. The test was performed to verify failure calculations. The area of anomalies failed at 3485 psi.

 

 

 


Discharge Header Installation:   Installing a discharge header at the bottom of the Kankakee River inside a Cofferdam.